Drafter
Clerk 10/28/2016
Title
A RULE AND REGULATION amending the fee for on-site sewage system monitoring and performance inspection before transfer of title to property; amending R&R 99-01, Section 2 (part); as amended, and BOH 2.18.020; enacted pursuant to RCW 70.05.060, including the latest amendments or revisions thereto.
Body
BE IT ADOPTED BY THE KING COUNTY BOARD OF HEALTH:
SECTION 1. R&R 99-01, Section 2 (part), as amended, and BOH 2.18.020 are each hereby amended to read as follows:
Fee schedule.
Fees pertaining to Title 13
Persons shall pay permit fees, application review fees, reinspection fees, monitoring report filing fees, variance request fees, special service fees and miscellaneous fees under Title 13 as set forth in the following fee schedule:
1. On-site sewage system construction permit fee
a. single-family, new pressurized $963.00
b. single-family, new gravity $854.00
c. single-family, repair or modification $691.00
d. single-family, limited repair $247.00
e. non-single-family $1,304.00
f. delinquent submittal of record drawing $184.80 per hour
2. On-site sewage system maintainer
certificate of competency fee
a. Issued July 1 or before $320.00
b. Issued after July 1 $160.00
c. Maintainer competency examination $320.00
3. Master installer certificate of
competency fee
a. Issued July 1 or before $320.00
b. Issued after July 1 $160.00
c. Master installer competency $320.00
examination
4. Associate installer certificate of
competency fee
a. Initial and renewal certificate $120.00
b. Associate installer competency $200.00
examination
5. On-site sewage system pumper certificate
of competency fee
a. Business owner $275.00
b. Pumper employee $120.00
c. Vehicle inspection tab $110.00 per
vehicle
d. Pumper competency examination $200.00
6. Site design application review fee
The site design application review fee
shall consist of a base fee, plus a potable
water review fee as follows, but the
potable water review fee shall be waived
if a potable water review has been
completed in the last two years:
a. Base fee
(1) Gravity system, new $602.00
(2) Pressurized system, new $953.00
b. Potable water review fee
(1) Served by Group A water system $0.00
with more than 1000 connections
(2) Served by Group A water system $0.00
with 1000 or fewer connections
(3) Served by Group B water system $238.00
(4) Served by individual well $154.00
c. Revision review $184.80 base fee
plus $184.80
per hour after one hour
7. Community and large on-site sewage systems review fees
a. Preliminary engineering report, $764.00
new and replacement
b. Plans and specifications, new $884.00
c. Plans and specifications, repaired $603.00
and replacement
d. Management agreement review $281.00
8. Subdivision review fees
a. Pre-application review $915.00 base fee
plus $150.00
per lot
b. Final application review $1,472.00 base
fee plus $200.00
per lot
9. Sewage review committee fees
a. Appeal review $1,478.40
b. Refunds, non refundable amount $99.00
10. Miscellaneous fees
a. Building remodel application review $642.00 base fee
plus potable water review
fee as delineated in Part 2,
subsection 6.b., but the
potable water review fee shall
be waived if a potable water
review has been completed in
the last two years
b. Wastewater tank manufacturers $184.80 base fee
standards review plus $184.80 per
hour after one hour
c. On-site sewage system maintainer's
maintenance and performance
monitoring inspection report filing:
(1) Periodic maintenance and $28.00
Performance monitoring
(2) Monitoring and performance $((111.00)) 184.80
inspection before transfer of
title to property
d. Alternative, community, commercial $184.80 base fee
system monitoring by the health officer plus $184.80 per hour after
one hour
e. Review of new proprietary device, $184.80 base
method or product fee plus $184.80 per hour
after one hour
f. Disciplinary/performance review $184.80 base fee
conference for certificate of plus $184.80 per hour after
competency holder one hour
g. Reinstatement of certificate after $184.80
suspension
h. Reinspection fee $184.80 base fee
plus $184.80 per hour after
one hour
i. Change of designer of record $184.80 base fee
plus $184.80 per hour after
one hour
j. Replacement private well/spring $369.60 base fee
location review plus $184.80 per hour after
two hours
k. Watertable monitoring plan review $831.60 base fee
plus $184.80 per hour after
4.5 hours
l. On-site sewage system operation and $40.00
maintenance program fee due from
buyer or transferee of a property served
by on-site sewage system at time of sale
or transfer of property ownership
m. Report on the condition of an $489.00
individual private, nonpublic well
n. Report on the condition of an $603.00
on-site sewage system and an
individual private, nonpublic well
on the same premises
o. Annual product development actual cost of review of
permit permit application, permit
issuance and monitoring of
product performance data
p. Rainwater catchment system actual cost of review of
review application for approval of
rainwater catchment system
source
SECTION 2. This rule and regulation takes effect January 1, 2017.
SECTION 3. Severability. If any provision of this rule or its application to any
person or circumstance is held invalid, the remainder of the rule or the application of the provision to other persons or circumstances is not affected.