Title: AN ORDINANCE relating to right-of-way construction permits, setting fees; and amending Ordinance 1711, Section 4, as amended, and K.C.C. 14.44.040.
Sponsors: Larry Gossett
Indexes: Budget, Fees, Permits
Code sections: 14.44.040 -
Attachments: 1. Ordinance 15316.pdf, 2. 2005-0423 - Hearing Notice.doc, 3. 2005-0423 Fiscal Note.xls, 4. 2005-0423 Regulatory Note.doc, 5. 2005-0423 Staff Report 2006 Right of Way fees.doc, 6. 2005-0423 Transmittal Letter.doc
title
AN ORDINANCE relating to right-of-way construction permits, setting fees; and amending Ordinance 1711, Section 4, as amended, and K.C.C. 14.44.040.
body
BE IT ORDAINED BY THE COUNCIL OF KING COUNTY:
SECTION 1.  A.  Section 2 of this ordinance proposes changes in the fees currently charged for right-of-way construction permits.
  1. These fees are assessed pursuant to K.C.C. 2.99.030.
SECTION 2.  Ordinance 1711, Section 4, as amended, and K.C.C. 14.44.040 is hereby amended as follows;
Construction permit - application - fees.  ((Effective January 1, 2002, e))Each application requires a fee payable to the ((property services division)) real estate services section for the administrative costs and expenses of processing the application.  The following fee schedule applies:
      ((1.)) A.  Pole ((L))lines:
      Power, telephone, etc. (every six poles or portion thereof):      $((80.00)) 100.00
      ((2.)) B.  Water:
      Installing mains (1000 lin. ft. or less):                  $((80.00)) 100.00
      Additional 1000 lin. ft. or fraction thereof:                  $((70.00)) 90.00
      Excavation for connection:                              $((80.00)) 100.00
      ((3.)) C.  Sewer:
      Installation of mains (1000 lin. ft. or fraction thereof):       $((80.00)) 100.00
      Additional 1000 lin ft. or fraction thereof:                  $((70.00)) 90.00
      Excavation for connection:                              $((80.00)) 100.00
      ((4.)) D.  Cable or ((C))conduit:
      Installing cable or conduit (1000 lin. ft. or less):            $((80.00)) 100.00
      Additional 1000 lin. ft. or fraction thereof:                  $((70.00)) 90.00
      Excavation ((in street)) for connection:                  $((80.00)) 100.00
      ((5.)) E.  Gas or ((O))oil:
      Installing mains (1000 lin. ft. or less):                  $((70.00)) 90.00
      Excavation for connection:                              $((80.00)) 100.00
      ((6.)) F.  Attachment to existing poles for every three
            attachments:                                    $((50.00)) 70.00
      ((7.)) G.  Immediate ((R))response ((P))permit ((R))requests:  In addition to the required permit fees an additional fee of ((forty)) sixty dollars shall be charged.
      H.  Maintenance permits:  Fees per number of connections:
        1.  0 to 50 connections:                                    $100.00
        2.  51 to 100 connections:                                    125.00
        3.  101 to 200 connections:                                    150.00
        4.  201 to 500 connections:                                    200.00
        5.  501 or more:                                          225.00
      SECTION 3.  This ordinance takes effect January 1, 2006.